November Soda
front shelves I had taken my two cubic feet of sprayed, bisqued and wadded ware to the Vault kiln on November 2nd, to join the most recent soda firing. The techs and Giovanna loaded the pots next day. Clive Tucker was at my kiln shed on the Friday to repair my electric kiln (there was corrosion!) and then he headed over to Shadbolt to help…